Health.Zone Web Search

Search results

  1. Results from the Health.Zone Content Network
  2. Ready-mix concrete - Wikipedia

    en.wikipedia.org/wiki/Ready-mix_concrete

    Ready-mix concrete refers to concrete that is specifically manufactured for customers' construction projects, and supplied to the customer on site as a single product. It is a mixture of Portland or other cements, water and aggregates: sand, gravel, or crushed stone.

  3. Retaining wall - Wikipedia

    en.wikipedia.org/wiki/Retaining_wall

    A retaining wall is designed to hold in place a mass of earth or the like, such as the edge of a terrace or excavation. The structure is constructed to resist the lateral pressure of soil when there is a desired change in ground elevation that exceeds the angle of repose of the soil. [1]

  4. Engineering drawing abbreviations and symbols - Wikipedia

    en.wikipedia.org/wiki/Engineering_drawing...

    Engineering drawing abbreviations and symbols are used to communicate and detail the characteristics of an engineering drawing. This list includes abbreviations common to the vocabulary of people who work with engineering drawings in the manufacture and inspection of parts and assemblies. Technical standards exist to provide glossaries of ...

  5. Grading (earthworks) - Wikipedia

    en.wikipedia.org/wiki/Grading_(earthworks)

    Grading (earthworks) Section through railway track and foundation showing the sub-grade. Grading in civil engineering and landscape architectural construction is the work of ensuring a level base, or one with a specified slope, [1] for a construction work such as a foundation, the base course for a road or a railway, or landscape and garden ...

  6. Glossary of construction cost estimating - Wikipedia

    en.wikipedia.org/wiki/Glossary_of_construction...

    Construction is a process that consists of the creation, modification, or demolition of facilities, buildings, civil and monumental works, and infrastructure. Construction cost - the total cost to construct a project. This value usually does not include the preplanning, site or right of way acquisition, or design costs, and may not include ...

  7. Exterior insulation finishing system - Wikipedia

    en.wikipedia.org/wiki/Exterior_insulation...

    Exterior insulation finishing system. A historic brick building in Germany covered with EIFS on the right side. Exterior insulation and finish system ( EIFS) is a general class of non- load bearing building cladding systems that provides exterior walls with an insulated, water-resistant, finished surface in an integrated composite material system.

  8. Construction management - Wikipedia

    en.wikipedia.org/wiki/Construction_management

    Construction cost management is a fee-based service in which the construction manager (CM) is responsible exclusively to the owner, acting in the owner's interests at every stage of the project. The construction manager offers impartial advice on matters such as: Optimum use of available funds.

  9. Commissioning (construction) - Wikipedia

    en.wikipedia.org/wiki/Commissioning_(construction)

    In construction, commissioning or commissioning process (often abbreviated Cx) [1] [2] [3] is an integrated, systematic process to ensure, through documented verification, that all building systems perform interactively according to the "Design Intent". The commissioning process establishes and documents the "Owner's Project Requirements (OPR ...