Search results
Results from the Health.Zone Content Network
USS Mustin (DDG-89) is an Arleigh Burke-class guided missile destroyer in the United States Navy.She is named in honor of the Mustin family who have devoted over a century to US Naval service.
The Navy Yard was first used for laying up inactive ships. The Congressional appropriations were small and the Navy had little need for the yard, which was closed from 1898 to 1900 and its personnel reassigned. By 1912, oil replaced coal in warships and again the Yard was scheduled for closure and the land relinquished by the Navy.
RSS Swordsman Sweden 2: Replacing some of the Challenger-class submarine, upgraded in 2016 till 2019, which includes optronic periscopes, combat management systems, sonars, countermeasure systems, digital data-links and attack capabilities which also allows the firing of new torpedoes and anti-ship missiles.
USS Sentry (MCM-3), an Avenger-class mine countermeasures ship, is the second U.S. Navy ship of that name. Sentry was laid down on 8 October 1984 by Peterson Builders in Sturgeon Bay, Wisconsin; launched on 20 September 1986 and commissioned on 2 September 1989.
USS Sterett (DLG/CG-31) was a Belknap-class destroyer leader / cruiser.She was the third ship to be named for Master Commandant Andrew Sterett (1778–1807), who served during the Quasi-War with France and the Barbary Wars.
Archaeological research has revealed a pre-Columbian era Indian presence throughout the area, dating back thousands of years.. Early in the 19th century, much of what is now the submarine base was the site of several plantations, including Cherry Point, Harmony Hall, New Canaan, Marianna and Kings Bay.
You've Got Mail!® Millions of people around the world use AOL Mail, and there are times you'll have questions about using it or want to learn more about its features. That's why AOL Mail Help is here with articles, FAQs, tutorials, our AOL virtual chat assistant and live agent support options to get your questions answered.
The ship was laid down in March 1984 and launched in October 1985 at the Fore River Shipyard, Quincy, Massachusetts.Later acquired on 20 November 1985 by the Maritime Administration for operation by American Overseas Marine.